Projects

Design

National design manual for bicycle traffic

The challenge

In order to reach the set goals for bicycle traffic, a significant improvement is required for bicycle infrastructure in Finland. The low standards of planning have limited the growth of cycling for decades.

Our approach

We wrote the manual form A to Z in order to set the necessary planning principles and introduce some new traffic arrangements. The manual content is following the best practices in the world and fit them in the local context.

Impact

The new national planning manual represents the new era of bicycle traffic planning in Finland. Building bike paths with the new standards will take time – but most importantly, the page has turned.

Bicycle Snake - Attractive Urban Bicycling Connector

The challenge

Improve connectivity and reduce travel time and route distance for users of a heavily trafficked bicycle route bifurcated by a canal in central Copenhagen.

What we did

Prepared the project proposal, detailed design and tender materials, as well as fabrication and construction inspection.

Effect

The “Bicycle Snake” prioritizes connectivity, greatly increases the convenience of bicycling, and is a visually stunning example of people-focused infrastructure.

Bicycle paths with lightened and fastened design process

The challenge

Helsinki is in the middle of a transition from bidirectional network for cycling to unidirectional network. The transition will take a long time, and there are serious gaps in the network.

Our approach

Our team suggested for the city of Helsinki that on the selected existing bicycle paths there could decent arrangements found with lightened planning process in order to fasten the transition and make new unidirectional network cohesive. The general method was to change existing bicycle paths to unidirectional on the line segment using road markings and traffic signs while make constructural changes only in the intersections.

The result

The cycling target network was extended with approx. 5 km of new bicycle paths serving much better cohesion for cyclists.

Bicycle highway of Munkkiniemi - preliminary design

Description

Preliminary design of bicycle highway of Munkkiniemi (in Helsinki)

Scope

Bicycle highway network in Helsinki is planned for improving the traffic on a system level. Bicycle highays are offering a sustainable moving choise for everyday life, which is competitive in terms of time and easiness with other modes of traffic. Munkkiniemi bicycle highway is only one route with a length of 4,5 km of the total of 130 km’s planned bicycle highways in Helsinki. As a result, the project delivered a high standard preliminary design based on Nordic best practices. The project contained multidisciplinary collaboration within Ramboll including street infra, environmental planning, GEO, Bridges etc.

The length of planned route is approx. 4,5 km’s

Client City Of Helsinki

Delivery period 06/2023-06/2024

Cycle Super Highway Rostock

Description

Preliminary design for Cycle Super Highways Rostock-LichtenhagenWarnemünde by redesigning the existing urban motorway

​Scope 

Preliminary design

Client Rostock municipality

Delivery period 03/2021 - 07/2022

Radbahn U1 Berlin

Description

Radbahn aims to convert the underutilised space under and along the iconic metro viaduct into a high-quality, urban environment by means of a roofed cycleway. In the technical feasibility study Ramboll has analysed 2 variants to realise Radbahn

Scope

  • Preliminary design
  • Cost estimation and cost-benefit-analysis
  • Microscopic simulation with Vissim
  • Communication, participation and stakeholder management including 

Client Berlin Senate Department for the Environment, Urban Mobility, Consumer Protection and Climate Action

Delivery period 04/2021-08/2023

Wayfinding for cycling in Helsinki

Description

Traffic sign plans of wayfinding in Helsinki (Part 2)

Scope

Establishing wayfinding for bicycle traffic will improve navigating in Helsinki. Improving infrastructure will take decades to reach the set targets. A quality wayfinding can be implemented in relatively short period and with relatively low costs and thus it is a low hanging fruit in promoting cycling for a lot of cities as well as an essential part of the modern cycling infrastructure. The plans are basing on the masterplan of wayfinding which is done in GIS using script tool named Signposter.

Client The City Of Helsinki

Delivery period 2020-2024

Maria’s cycling tunnel – a tunnel segment on a western bicycle highway

Description

Preliminary design and construction planning detailed design of tunnel segment of Western bicycle highway
in Helsinki

Scope

Western bicycle highway starts in an old railway corridor in a city center of Helsinki. A segment around old Maria's hospital area has been a challenge in terms of space and flow speed in the intersection of Mechelininkatu. Helsinki's comprehensive plan for bicycles has an early stage idea to pass under the old hospital area. Underpass would save time and would keep bicycle path segregated from busy car traffic. The plan is challenging passing under the historical buildings. The tunnel should be built as low incline as possible balancing with the ground thickness between the tunnel roof and the building base. The Exit in the west is between two historical graveyards, which will leave little room for exit ramp. Task is a challenge, but it serves the biggest bicycle flow in Helsinki and would make level of service better for bikes in many ways such as time savings.

Client City of Helsinki

Delivery period 11/2023-9/2024

Bicycle bridge over Copenhagen Harbour

Description

Analysis of bridge alignment and land connections

Scope

Elaboration of a previous project by another consultant, particularly with regards to the solutions at the land connections 

Client City of Copenhagen

Delivery period April – December 2024

Type drawings for cycling

Description

Type drawings for cycling infrastructure to ensure uniform implementation of street design.

Scope

Detailed design type drawings

Client City Of Helsinki

Delivery period 2020 - Continous

Bicycle street in Helsinki -​Construction planning

Description

Construction Planning for Kulosaaren puistotie cycling street.

Scope

The task was to plan a construction plans to Kulosaaren puistotie. Kulosaaren puistotie was transformed to cycling street. The plan included all the documents from detailed design to implementation documents. The plan included also public engagement.

Client The City Of Helsinki

Delivery period 2020